MOQ and Lead Time by Process
Typical minimum order quantities and lead times for each process. Final dates are confirmed on the formal quotation.
MOQ and lead time at a glance
| Process | Minimum order | Typical lead time |
|---|---|---|
| 3D printing (SLA, SLS, MJF) | 1 piece | 2–3 days |
| CNC prototypes | 1 piece | 3–5 days |
| CNC production | 1 piece | 5–10 days |
| Vacuum casting | 1 piece (up to about 500) | 5–7 days |
| Rapid tooling | — | About 15 days for the mold |
| Standard injection mold | — | 25–35 days for the mold |
| Injection molding | Typically 500–1,000 parts per run | 15–35 days depending on quantity and finishing |
| Die casting | Quoted per project | Quoted per project |
What changes MOQ and lead time
Resin, color and changeover
Molding MOQ depends on material purchase quantities, the number of colors and set-up time.
Mold complexity
Slides, lifters, cavity count and steel grade drive the tooling schedule.
Finishing and assembly
Painting, plating, printing and sub-assembly add time and are scheduled with production.
Capacity
The workshop runs two shifts (about 18 hours a day); office hours are Mon–Sat 08:30–18:00 China time.
More detail: MOQ for CNC and injection molding in China
MOQ and lead time FAQ
Is there a minimum order for CNC machining?
No. CNC machining, 3D printing and vacuum casting start from 1 piece.
What is the MOQ for injection molding?
Typically 500–1,000 parts per run. For smaller quantities we recommend rapid tooling, vacuum casting or CNC machining.
Can you rush an order?
Rush service is available for prototypes. Tell us the date you need parts and we confirm what is achievable with the quote.