QC workshop

Inspection and Testing

Only qualified parts move to the next operation. Every order passes four inspection gates and ships with a full inspection report.

Strict gates

Only qualified components move to the next procedure

4-step QC on every order: material certificate on arrival → first article dimensional check → 3D coordinate measurement → full inspection report shipped with the goods.

  • Material certificate on arrival
  • First article dimensional check
  • 3D coordinate measurement
  • Full inspection report with shipment

Define QC scope

Inspection gates

Inspection is built into each stage of production rather than left to the end.

GateWhat is checkedRecord
Incoming (IQC)Material grade and certificate, stock size, purchased componentsMaterial certificate
First articleFirst part from each set-up against the drawingFirst article report
In-process (IPQC)Critical dimensions and appearance during the run; SPC on monitored characteristicsIn-process records
Final (OQC)Dimensions, appearance, quantity and packing before shipmentFull inspection report with 3D measurement

Measurement

3D coordinate measurement

Critical dimensions are measured on a coordinate measuring machine, and the results are included in the report shipped with your parts.

Tight tolerances

Machined features can be held to 0.005 mm and surfaces to Ra 0.4 µm where the drawing requires it, with measurement methods agreed before production. See CNC machining tolerances.

Define the inspection scope with your RFQ

  • Mark critical-to-function dimensions and datums on the 2D drawing
  • State cosmetic class and inspection surfaces for visible parts
  • Specify sampling plan or 100% inspection where needed
  • List documents required: first article report, material certificates, measurement data

Inspection FAQ

Do you inspect every order?

Yes. Every order passes incoming, first article, in-process and final inspection, and ships with a full inspection report.

Can you provide a first article inspection report?

Yes. First article reports are available on request and are agreed with the quote.

Do you use a CMM?

Yes. Critical dimensions are measured with 3D coordinate measurement, and the results are included in the inspection report.

Get parts with a full inspection report

Free DFM · NDA before file review · reply ≤12h · quote ≤24h on complete RFQ · ISO 9001:2015

Request a quote