Inspection and Testing
Only qualified parts move to the next operation. Every order passes four inspection gates and ships with a full inspection report.

Only qualified components move to the next procedure
4-step QC on every order: material certificate on arrival → first article dimensional check → 3D coordinate measurement → full inspection report shipped with the goods.
- Material certificate on arrival
- First article dimensional check
- 3D coordinate measurement
- Full inspection report with shipment
Inspection gates
Inspection is built into each stage of production rather than left to the end.
| Gate | What is checked | Record |
|---|---|---|
| Incoming (IQC) | Material grade and certificate, stock size, purchased components | Material certificate |
| First article | First part from each set-up against the drawing | First article report |
| In-process (IPQC) | Critical dimensions and appearance during the run; SPC on monitored characteristics | In-process records |
| Final (OQC) | Dimensions, appearance, quantity and packing before shipment | Full inspection report with 3D measurement |
Measurement
3D coordinate measurement
Critical dimensions are measured on a coordinate measuring machine, and the results are included in the report shipped with your parts.
Tight tolerances
Machined features can be held to 0.005 mm and surfaces to Ra 0.4 µm where the drawing requires it, with measurement methods agreed before production. See CNC machining tolerances.
Define the inspection scope with your RFQ
- Mark critical-to-function dimensions and datums on the 2D drawing
- State cosmetic class and inspection surfaces for visible parts
- Specify sampling plan or 100% inspection where needed
- List documents required: first article report, material certificates, measurement data
Inspection FAQ
Do you inspect every order?
Yes. Every order passes incoming, first article, in-process and final inspection, and ships with a full inspection report.
Can you provide a first article inspection report?
Yes. First article reports are available on request and are agreed with the quote.
Do you use a CMM?
Yes. Critical dimensions are measured with 3D coordinate measurement, and the results are included in the inspection report.
Get parts with a full inspection report